Login »

01-009

Analysis of Shutdown States within Nordic Owner's Group (NOG)

Project Manager, NPSAG: BKAB
Start Year: 2000
Finish Year: 2004
The matter has connections to matter 06-001.
















Projects:  Analysis of Shutdown States within Nordic Owner's Group (NOG)

01-009  Analysis of Shutdown States within Nordic Owner's Group (NOG) »
01-010  Mapping of Methodology for Existing Analyses of Shutdown States »
01-011  S-PSA Shutdown PSA »
02-001  PSA RA PSA of other Operating Sates than Power Operation »